Monte Cañón

Degraded

Galicia · Wind · 74 MW installed · 6 technicians · manager Kiarra Swaniawski

Output now

34.9 MW

Load factor

47 %

Energy today

627 MWh

Availability

96.9 %

Producing

12 / 16

Open alarms

4

Generation
Last 12 hours
Wind, solar and battery power at the point of interconnection. A charging battery shows below zero.
Conditions
Resource and grid

Wind

10.5 m/s S

Irradiance

0 W/m²

Temperature

14.3 °C

Cloud cover

35 %

Conditions

Sunny intervals

Substation

Mesón SE 220 kV

Voltage

221.0 kV

Frequency

49.986 Hz

Power factor

0.988

Curtailment

19 %

Day-ahead price

68.31 €/MWh

Assets

16 assets on site. Open one for its live 3D view.

Power flow

Wind turbine

WTG-01

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
65%

Output

4.05 MW

Today

43.2 MWh

Wind

10.9 m/s

Wind turbine

WTG-02

Siemens Gamesa SG 6.6-170 · 4.2 MW

Producing
27%

Output

1.11 MW

Today

45.2 MWh

Wind

8.4 m/s

Wind turbine

WTG-03

Nordex N149/4.0-4.5 · 6.2 MW

Producing
25%

Output

1.54 MW

Today

57.2 MWh

Wind

8.4 m/s

Wind turbine

WTG-04

Siemens Gamesa SG 5.0-145 · 5.0 MW

Producing
3%

Output

0.15 MW

Today

39.7 MWh

Wind

5.4 m/s

Wind turbine

WTG-05

Nordex N149/4.0-4.5 · 6.2 MW

Producing
61%

Output

3.76 MW

Today

47.5 MWh

Wind

10.7 m/s

Wind turbine

WTG-06

Vestas V162-6.2 · 5.0 MW

Producing
90%

Output

4.51 MW

Today

46.9 MWh

Wind

12.6 m/s

Wind turbine

WTG-07

Vestas V162-6.2 · 4.2 MW

Curtailed
2%

Output

0.09 MW

Today

19.6 MWh

Wind

5.7 m/s

Wind turbine

WTG-08

Nordex N149/4.0-4.5 · 6.2 MW

Producing
91%

Output

5.64 MW

Today

57.2 MWh

Wind

11.6 m/s

Wind turbine

WTG-09

Vestas V150-4.2 · 6.2 MW

Producing
87%

Output

5.41 MW

Today

54.9 MWh

Wind

11.6 m/s

Wind turbine

WTG-10

Siemens Gamesa SG 5.0-145 · 6.2 MW

Producing
27%

Output

1.64 MW

Today

59.4 MWh

Wind

8.6 m/s

Wind turbine

WTG-11

Siemens Gamesa SG 6.6-170 · 5.0 MW

Producing
100%

Output

5.00 MW

Today

58.3 MWh

Wind

13.2 m/s

Wind turbine

WTG-12

Vestas V162-6.2 · 5.0 MW

Standby
0%

Output

0.00 MW

Today

44.6 MWh

Wind

7.3 m/s

Wind turbine

WTG-13

Siemens Gamesa SG 5.0-145 · 4.2 MW

Producing
39%

Output

1.65 MW

Today

28.6 MWh

Wind

9.5 m/s

Wind turbine

WTG-14

Vestas V150-4.2 · 4.2 MW

Curtailed
8%

Output

0.35 MW

Today

24.8 MWh

Wind

7.7 m/s

Inverter skid

INV-01

SMA Sunny Central 4600 UP · 5.0 MVA

Producing
95%

Output

4.75 MW

Today

39.2 MWh

Availability

99.6 %

Inverter skid

INV-02

Sungrow SG3125HV-MV · 5.0 MVA

Curtailed
1%

Output

0.04 MW

Today

20.6 MWh

Availability

94.2 %

Alarms
Site alarms
Most recent events from this site's assets.

Blade ice detected

WTG-02· 10-07 15:10
medium

IGBT temperature high

INV-02· 10-07 08:19
low

Pitch system hydraulic pressure low

WTG-05· 10-07 00:52
low

Yaw misalignment above limit

WTG-07· 10-06 20:34
low