EX-02

Working

Excavator · Caterpillar 349 (2013) · 15,796 h · Scroggie Creek

Last seen 18:54:13

Digital twin
Live machine view
Work cycle, load, fuel and lamps follow live telemetry. Drag to rotate, scroll to zoom.
Working
Assignment
Feeding WP-2
Operator Kellie Bashirian

Wash plant

s-scr-wp2

Hours today

9.8 h

Cycle time

29s

Cycles today

912

Engine hours

15,796 h

Next service

in 250 h

Telemetry
Live readings

Engine speed

1,754rpm

Coolant

91.8°C

Hydraulic oil

75.6°C

Hydraulic pressure

321bar

Bucket fill

95%

Fuel burn

60.7L/h
Fuel
Tank level
38%

472 L

In tank

60.7 L/h

Burn

7.7 h

Range

Utilisation
Hours on this shift

9.8 h

of a 12 h shift · 82% utilisation

Load

95%

Engine speed

1,754 rpm

Coolant

92 °C

Per hour
Utilisation and fuel burned today
Production day starts at 07:00.

Utilisation · %

Fuel · L

Alarms
Alarms (0)

No alarms on this unit in the last 48 hours.

Engine history
Engine speed, coolant and fuel level

Engine speed · rpm

Coolant · °C

Fuel level · %